New Foundation – H-E-B Bread Plant Corpus Christi

Location: Corpus Christi, TX

Timeline: 4 Weeks

Description: Full civil services included:

  • Saw cutting and removal of existing concrete to excavate for multiple electrical duct banks.
  • Back-fill of completed electrical duct bank conduits in 8” lifts with select fill (per engineering specs (~450 tons)
  • Installation of select fill grade beam subgrade for 2’ tall equipment pad. (~60 tons)
  • Installation of 2’ tall formwork (~300 sf) and rebar (~700LF)
  • Placement of concrete (~80CY’s)
  • Removal of formwork and final site clean-up.